3,600 SF hangar (60' × 60') at Spanish Fork Airport with a 55' × 18' door (17'2.5" clear). Features insulated wall panels, gas-fired Reznor heater, 100A three-phase power, LED high-bay lighting, 50A EV-charger circuit, floor and trench drains, and water/sewer for a future restroom. Includes access to a public restroom and NFPA 13 fire sprinklers.
Own the building on a transferable 50-year Spanish Fork City ground lease. 2026 ground rent is $0.67/SF annually, with property tax on the structure only.